Commercial Architect + MEP Engineer in Katy, TX

QD Design is a HUB-certified architecture and MEP engineering firm based in Cypress, Texas that produces complete commercial permit sets for Katy: architectural drawings plus sealed mechanical, electrical, and plumbing engineering under one contract, led by a Texas-licensed Professional Engineer. Katy sits minutes from our Cypress office, and we’ve already permitted work here through the Harris County review path that covers most Katy addresses.

Katy Project Experience

Permitting in Katy

“Katy” spans three counties and two review worlds: inside the City of Katy limits, the city’s permit office reviews your project; the far larger unincorporated areas run through Harris County or Fort Bend County. Our F45 + FS8 dual fitness studios at 3170 Peek Road were permitted through Harris County with parallel TDLR filings. Knowing which reviewer your address answers to is step one — we confirm it before we propose. Statewide, any Texas commercial project valued over the $50,000 statutory threshold also requires TDLR registration and Texas Accessibility Standards (TAS) review — we file the registration and coordinate the accessibility review as part of the package.

What We Design in Katy

Every project type below gets the same one-contract package — architecture and sealed MEP together:

Frequently Asked Questions

Do you have completed projects in Katy?

Yes — the F45 + FS8 dual fitness studios at 3170 Peek Road, designed as one architecture + MEP package with parallel Harris County permits and TDLR filings.

Who reviews commercial permits in Katy?

It depends on the address: inside the City of Katy limits, the city reviews; the much larger unincorporated areas run through Harris County or Fort Bend County. TDLR accessibility review applies statewide over the $50,000 threshold, and we file it as part of the package.

How fast can you deliver a permit set?

Typical tenant-improvement packages run 3–5 weeks from contract to submittal. On the fast end, our 25,250 SF Star Pipe industrial renovation in Houston had schematic design approved 7 days after signing. Answering plan-review comments until the permit is issued is standard scope.

See also: all service areas · Houston · 30 case studies · Houston commercial permit guide.

Start Your Katy Project

One firm, one contract, a permit-ready set. Send us your floor plan — fee proposal within one business day.