Industrial MEP that kept pace with changing production equipment.
QD Design delivered complete MEP design for a Houston food production and distribution facility, working alongside the general contractor through equipment selection changes and electrical revisions as the production line evolved. Food processing plants combine refrigeration loads, washdown-rated electrical, humidity control, and sanitary drainage — systems that must be designed together. The engagement ran through multiple coordinated revision cycles to match final equipment schedules.
Project Facts
- Location: Houston, TX
- Project type: Industrial
- Size: Industrial food processing plant
- Scope: Mechanical, electrical, plumbing design with electrical revisions
- Jurisdiction / plan review: City of Houston
- Code basis: IBC/IMC/IPC/IFC 2021, NEC 2020, TAS
Key Systems Designed
- Process HVAC with thermal-load and humidity control
- Electrical distribution for production and refrigeration equipment
- Sanitation-grade process plumbing
Frequently Asked Questions
Who designed the Food Production & Distribution Facility project?
QD Design, a HUB-certified architecture and MEP engineering firm based in Cypress, Texas, provided mechanical, electrical, plumbing design with electrical revisions for this industrial project in Houston, TX.
What codes applied to this industrial project?
The design was produced under IBC/IMC/IPC/IFC 2021, NEC 2020, TAS, with plan review by City of Houston.
Does QD Design handle similar industrial projects?
Yes. QD Design provides architecture and MEP engineering for industrial projects across Texas (Houston, Austin, Dallas–Fort Worth, San Antonio) and in Florida and Minnesota. Send your floor plan for a fee proposal within one business day.
Start Your Project
Planning a industrial project in Houston or anywhere in Texas? QD Design delivers architecture and sealed MEP engineering under one contract. Send us your floor plan — you’ll get a fee proposal within one business day.