Assembly-load engineering that respects a congregation's operating budget.
Worship facilities are assembly occupancies: hundreds of occupants arriving at once, ventilation demand spiking for two hours, then an empty building all week. QD Design engineered the MEP systems for the Redeemed Christian congregation's facility, designing for peak assembly loads without saddling the church with oversized equipment running all week, and carried the design through construction-phase change orders as the buildout evolved.
Project Facts
- Location: Houston, TX
- Project type: Religious
- Size: Worship facility
- Scope: Mechanical, electrical, plumbing design (with change-order phases)
- Jurisdiction / plan review: Houston metro
- Code basis: IBC/IMC/IPC/IFC 2021, NEC 2020, TAS
Key Systems Designed
- High-occupancy assembly HVAC
- Sanctuary lighting and sound-system power provisions
- Assembly-occupancy restroom plumbing
Frequently Asked Questions
Who designed the Redeemed Christian Church project?
QD Design, a HUB-certified architecture and MEP engineering firm based in Cypress, Texas, provided mechanical, electrical, plumbing design (with change-order phases) for this religious project in Houston, TX.
What codes applied to this religious project?
The design was produced under IBC/IMC/IPC/IFC 2021, NEC 2020, TAS, with plan review by Houston metro.
Does QD Design handle similar religious projects?
Yes. QD Design provides architecture and MEP engineering for religious projects across Texas (Houston, Austin, Dallas–Fort Worth, San Antonio) and in Florida and Minnesota. Send your floor plan for a fee proposal within one business day.
Start Your Project
Planning a religious project in Houston or anywhere in Texas? QD Design delivers architecture and sealed MEP engineering under one contract. Send us your floor plan — you’ll get a fee proposal within one business day.