Commercial Architect + MEP Engineer in Pearland, TX

QD Design is a HUB-certified architecture and MEP engineering firm based in Cypress, Texas that produces complete commercial permit sets for Pearland: architectural drawings plus sealed mechanical, electrical, and plumbing engineering under one contract, led by a Texas-licensed Professional Engineer. We’ve completed both a franchise wellness buildout and an office/warehouse project in Pearland — two very different reviews, one firm.

Pearland Project Experience

Permitting in Pearland

The City of Pearland reviews commercial projects through its own permit process, with TDLR accessibility registration running alongside. Both of our completed Pearland projects — the Hand & Stone spa and the Building 9 office/warehouse — carried TDLR coordination as part of the package. Statewide, any Texas commercial project valued over the $50,000 statutory threshold also requires TDLR registration and Texas Accessibility Standards (TAS) review — we file the registration and coordinate the accessibility review as part of the package.

What We Design in Pearland

Every project type below gets the same one-contract package — architecture and sealed MEP together:

Frequently Asked Questions

Do you have completed projects in Pearland?

Yes — two: the Hand & Stone massage spa (our second location for that franchise) and the Building 9 office/warehouse, both designed as one architecture + MEP package with TDLR coordination.

Who reviews commercial permits in Pearland?

The City of Pearland reviews commercial projects through its own permit process. TDLR accessibility review applies statewide over the $50,000 threshold, and we file it as part of the package.

How fast can you deliver a permit set?

Typical tenant-improvement packages run 3–5 weeks from contract to submittal. On the fast end, our 25,250 SF Star Pipe industrial renovation in Houston had schematic design approved 7 days after signing. Answering plan-review comments until the permit is issued is standard scope.

See also: all service areas · Houston · 30 case studies · Houston commercial permit guide.

Start Your Pearland Project

One firm, one contract, a permit-ready set. Send us your floor plan — fee proposal within one business day.

Scroll to Top