QD Design is a HUB-certified architecture and MEP engineering firm based in Cypress, Texas that produces complete commercial permit sets for Tomball: architectural drawings plus sealed mechanical, electrical, and plumbing engineering under one contract, led by a Texas-licensed Professional Engineer. Tomball sits just up SH-249 from our Cypress office, and our completed work here went through one of the tougher plan reviews in our portfolio — and passed.

Tomball Project Experience

  • La Reserva meat market, 6,000 SF — a 25-comment deficiency notice answered to approval, including Type I hood suppression and walk-in cooler envelope compliance.

Permitting in Tomball

The City of Tomball reviews commercial work through its own building department, and it reads drawings closely: our La Reserva meat market received a 25-comment deficiency notice, and we answered every comment to approval — including Type I hood suppression and walk-in cooler envelope compliance. That comment-response work is standard scope for us, not an extra. Statewide, any Texas commercial project valued over the $50,000 statutory threshold also requires TDLR registration and Texas Accessibility Standards (TAS) review — we file the registration and coordinate the accessibility review as part of the package.

What We Design in Tomball

Every project type below gets the same one-contract package — architecture and sealed MEP together:

Frequently Asked Questions

Do you have completed projects in Tomball?

Yes — the 6,000 SF La Reserva meat market, where we answered a 25-comment deficiency notice to approval, including Type I hood suppression and walk-in cooler envelope compliance.

Who reviews commercial permits in Tomball?

The City of Tomball reviews commercial work through its own building department — and it reads drawings closely. TDLR accessibility review applies statewide over the $50,000 threshold, and we file it as part of the package.

How fast can you deliver a permit set?

Typical tenant-improvement packages run 3–5 weeks from contract to submittal. On the fast end, our 25,250 SF Star Pipe industrial renovation in Houston had schematic design approved 7 days after signing. Answering plan-review comments until the permit is issued is standard scope.

See also: all service areas · Houston · 30 case studies · Houston commercial permit guide.

Start Your Tomball Project

One firm, one contract, a permit-ready set. Send us your floor plan — fee proposal within one business day.