QD Design is a HUB-certified architecture and MEP engineering firm based in Cypress, Texas that produces complete commercial permit sets for Humble: architectural drawings plus sealed mechanical, electrical, and plumbing engineering under one contract, led by a Texas-licensed Professional Engineer. Our Golden Chick QSR on FM 1960 went through the City of Humble’s review as a single architecture + MEP package — hood, power, and grease design coordinated before submittal.
Humble Project Experience
- Golden Chick QSR on FM 1960 — Type I hood, three-phase kitchen power, grease interceptor sizing.
Permitting in Humble
The City of Humble reviews commercial projects through its own building department on the northeast side of the Houston metro. Our Golden Chick QSR on FM 1960 was permitted here — Type I hood, three-phase kitchen power, and grease interceptor sizing all cleared through the city’s review as one architecture + MEP package. Statewide, any Texas commercial project valued over the $50,000 statutory threshold also requires TDLR registration and Texas Accessibility Standards (TAS) review — we file the registration and coordinate the accessibility review as part of the package.
What We Design in Humble
Every project type below gets the same one-contract package — architecture and sealed MEP together:
- Restaurant Design in Humble
- Medical & Dental Office Design in Humble
- Retail Buildout Design in Humble
- Daycare & School Design in Humble
- Church Design in Humble
- Warehouse & Industrial Design in Humble
- Spa, Salon & Fitness Design in Humble
- Senior Living Design in Humble
Frequently Asked Questions
Do you have completed projects in Humble?
Yes — the Golden Chick QSR on FM 1960: Type I hood, three-phase kitchen power, and grease interceptor sizing, permitted through the City of Humble.
Who reviews commercial permits in Humble?
The City of Humble reviews commercial projects through its own building department. TDLR accessibility review applies statewide over the $50,000 threshold, and we file it as part of the package.
How fast can you deliver a permit set?
Typical tenant-improvement packages run 3–5 weeks from contract to submittal. On the fast end, our 25,250 SF Star Pipe industrial renovation in Houston had schematic design approved 7 days after signing. Answering plan-review comments until the permit is issued is standard scope.
See also: all service areas · Houston · 30 case studies · Houston commercial permit guide.
Start Your Humble Project
One firm, one contract, a permit-ready set. Send us your floor plan — fee proposal within one business day.