Commercial Architect + MEP Engineer in Mesquite, TX

QD Design is a HUB-certified architecture and MEP engineering firm based in Cypress, Texas that produces complete commercial permit sets for Mesquite: architectural drawings plus sealed mechanical, electrical, and plumbing engineering under one contract, led by a Texas-licensed Professional Engineer. Our KPot Korean BBQ & hot pot restaurant was designed for Mesquite — a heavy-ventilation format that demands exactly the architecture/MEP coordination one firm under one contract provides.

Mesquite Project Experience

Permitting in Mesquite

The City of Mesquite reviews commercial projects through its own building department on the east side of the DFW metro. Our KPot Korean BBQ & hot pot restaurant — one of the most ventilation-intensive restaurant formats, with exhaust at every table — was designed for Mesquite, and we support the wider DFW market with the same one-contract package. Statewide, any Texas commercial project valued over the $50,000 statutory threshold also requires TDLR registration and Texas Accessibility Standards (TAS) review — we file the registration and coordinate the accessibility review as part of the package.

What We Design in Mesquite

Every project type below gets the same one-contract package — architecture and sealed MEP together:

Frequently Asked Questions

Do you have completed projects in Mesquite?

Yes — the KPot Korean BBQ & hot pot restaurant, a heavy-ventilation restaurant format designed as one architecture + MEP package. Our Euless lash-studio prototype covers the west side of the metro.

Who reviews commercial permits in Mesquite?

The City of Mesquite reviews commercial projects through its own building department on the east side of the DFW metro. TDLR accessibility review applies statewide over the $50,000 threshold, and we file it as part of the package.

How fast can you deliver a permit set?

Typical tenant-improvement packages run 3–5 weeks from contract to submittal. On the fast end, our 25,250 SF Star Pipe industrial renovation in Houston had schematic design approved 7 days after signing. Answering plan-review comments until the permit is issued is standard scope.

See also: all service areas · Houston · 30 case studies · Houston commercial permit guide.

Start Your Mesquite Project

One firm, one contract, a permit-ready set. Send us your floor plan — fee proposal within one business day.

Scroll to Top